Overall of Specialist area

Overall of Specialist area

Office-complex and Data Center

Office-complex and Data Center

Perspective of Manufacturing Area

Perspective of Manufacturing Area

outstanding numbers

670,796
m2

Land area for workshop

64 - 404

Villas, Apartments for rent

147.809
m2

Factory area for rent: Total area 147.809 m2 form 3000 m2 – 8000 m2

16line SMT

EMS FACTORY in 2021

Why Da nang It Park

Da Nang is the largest human resource training center in Central and the third in Vietnam. Annual new graduates from training and education organizations: 44.227 students.

Da Nang's workforce, accounting for more than 70% of the population, is young, dynamic, diligent and well-trained.

Read more

Location map

INTRODUCTION
DITP is located in Northwestern Economic Development, Da Nang, 20 minutes drive from the city center. It is easy to access the Centre Business District, Airport, Seaport, Universities and Local attractions

CONNECTING AROUND DA NANG CITY
DITP connects with industrial parks, international airport, international seaport, residental area via main routes including
+Da Nang - Quang Ngai Expressway
+Extended Nguyen Tat Thanh Street
+Future BRT and shuttle-bus routes
+Furture Lienchieu International Seaport
 
Read more

Functional Planning

Mixed – use and Business Center

100.363 m2

Center Area

87.320m2

Residential Area

187.471m2

IT Production/ Manufacturing Area

217.464 m2

R&D, Incubator, Consultant service

745.619 m2

Infrastructure & Utilities

Transport

The coordinated transportation system with 30-40m wide Central road and the 15,5m wide grid roads in functional area.

- Danang IT Park connects with the main route:
• Da Nang – Quang Ngai Expressway
• Extended Nguyen Tat Thanh Street
• Future BRT and Shuttle-bus routes
• Lien Chieu International Seaport

Power supply

Using the power source from the 110kV transformer station in High-tech Park and the power solar system at manufaturing area.

Water supply

The water source from Danang water supply system and from Hoa Trung Lake water manufactory.

Drainage system

Be designed in seperated directions, including rainwater drainage and wastewater drainage. These two systems are connected to the common drainage system in area.

Wastewater treatment

Wastewater must be treated by the main wastewater treatment system of Danang High-tech Park and Danang IT Park’s wastewater treatment manufactory.

Information and communication technology

International direct-dial telephone, facsimile, boardband and data transmission services, 48 Fo fiber optic facilities.

Project Introduction

Green space is widely distributed throughout the project, around the water area with outdoor and natural scenery designed facilities to provide the complete Work-Live-Play environment with extensive range of business support services as well as recreational and life- style amenities for people living and working at DITP.

Investors & Partners